1.If you set the deepest subpision load line to master on the surface, this type of stain easily seen.
如果不兵水喷到母盘暗地上,此类瑕玷极易看到。
2.Independent current limit and load line setting inputs for additional design flexibility.
独立的电流限制及负载线路设置投入更多的设计灵活性。
3.Not suited below deep load line in association with impressed current cathodic protection .
当装有外加电流阴极保护装置时,本品不宜涂在重载水线以下。
4.Ship's name, port of registry, draft marks and load line marks to be dressed and repainted.
船名,船籍港,吃水标志和载重线标志需修饰,重刷。
5.As a finishing coat on ships'exterior hull from rail to load line, steelstructure on deck and similar.
作为面漆涂在船壳外表面栏杆至载水线部位,甲板上的钢结构表面及类似部位。
6.PSCO: Your ship's Load Line Certificate expired a few days ago because the annual survey hasn't been carried out.
船舶载重线证书由于没有进行年度检验,在几天前已经过期了。
7.Inspection dimension of load line after marking out.
载重线标志划线后检查尺度。
8.When we deal with floatability, must first be clear about the following two technical terms, i. e. reserve buoyancy and load line mark.
当我们研究浮性时,我们必须首先弄清下列两个技术术语,即储备浮力和载重线标志。
9.This is due to the bias point differences and load line differences.
这是由于偏见点载重线的分歧和差异。
10.Solving the Alternating Load Line Equation by the General Current Path
由总电流通路求交流负载线方程